Tuesday, January 1, 2019

NEW YEAR new progress.

A few different lines of progress over the Holidays.
Rebuilding my Auto Lamp 151







Next project was curbing.
3 layers plywood to get close to 3/4". 
The 5mm-1/4" I had didn't like to bend to well but the leftover wrap plywood did great.
 9mm-5mm-9mm Don't ya just hate this metric plywood.


Got the tail light blocks in and cut out while doing the curbing.

Interior of our modified surplus door got a wood veneer to make it fit in with the rest of the interior.
That pebble white plastic just wasn't gonna work for us.


And as a final bit of work for the New Year I got a few of our cork ceiling tiles installed so I could install the last light over the bench.
It's gonna be different but will add such a rich look when all is done.


No comments:

Post a Comment